Implement average function in src/calculator.py — done
Write tests for average function — done
Review average implementation and tests — done
Open
none
<!-- typosaurus:progress run=32dcefafeb39422b82cbd65f56833df7 id=4fecaff29022 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T14:51:57.985615+00:00
## Progress
State: running
Completed: 4/4 nodes
Current: none — none
Cost: 0.0074 USD · Elapsed: 2m
### Completed
- Add an average function to the calculator — done
- Implement average function in src/calculator.py — done
- Write tests for average function — done
- Review average implementation and tests — done
### Open
- none
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=ee0f9d245459 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T14:52:01.782663+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 54m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=2d146807d06a team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:44:07.583367+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 54m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 55m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=e168b3e79980 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:44:14.827731+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 55m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 4m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=0549957936f9 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:54:09.611149+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 4m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 5m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=49445350cbc2 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:54:19.431493+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 5m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=c2f98ea37d3d team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:56:36.588308+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=6a5a0357e028 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T17:56:45.012891+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=a9bc8fa63076 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:06:38.832515+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=636904cf8ebe team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:06:45.335558+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=e93f5c95aafd team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:14:21.979977+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=444b75cd5185 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:14:31.755644+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 34m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=c08d2a59102e team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:24:10.916929+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 34m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 35m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=3a9710c1339f team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T18:24:17.678820+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- Publish: push the branch and open the pull request — failed
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 35m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
Implement average function in src/calculator.py — done
Write tests for average function — done
Review average implementation and tests — done
Reconcile rebase conflicts onto main — done
Open
Publish: push the branch and open the pull request — ready
<!-- typosaurus:progress run=32dcefafeb39422b82cbd65f56833df7 id=ea48a13482de team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T20:12:42.193392+00:00
## Progress
State: running
Completed: 5/6 nodes
Current: none — none
Cost: 0.0090 USD · Elapsed: 5h 23m
### Completed
- Add an average function to the calculator — done
- Implement average function in src/calculator.py — done
- Write tests for average function — done
- Review average implementation and tests — done
- Reconcile rebase conflicts onto main — done
### Open
- Publish: push the branch and open the pull request — ready
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=236244f58f1a team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T20:12:55.395548+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: #12
<!-- typosaurus:summary run=32dcefafeb39422b82cbd65f56833df7 id=e11cbf530582 team=74aedd7ab23d42ecada0462b9317b035 -->
**YELENA · project-manager** — 2026-07-26T20:12:57.527810+00:00
## Result
Run completed for ticket #11.
Delivered:
- The ticket objective is satisfied: Add an average function to the calculator — met (see commits)
Not delivered:
- none
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: https://retoor.molodetz.nl/typosaurus/typosaurus-sandbox/pulls/12
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Add an
average(values)function to src/calculator.py returning the arithmetic mean, raising ValueError on an empty sequence. Follow the conventions in CLAUDE.md.YELENA · project-manager — 2026-07-26T14:49:12.553689+00:00
Ticket claimed by team Alpha Squad.
Branch: typosaurus/11-add-an-average-function-to-the-calculator
Agents assigned: @yelena, @katya, @mila, @vera, @nadia, @sveta, @tanya, @zoya, @irina, @oksana, @larisa
Next: Decompose the ticket into an executable tree.
YELENA · project-manager — 2026-07-26T14:51:57.985615+00:00
Progress
State: running
Completed: 4/4 nodes
Current: none — none
Cost: 0.0074 USD · Elapsed: 2m
Completed
Open
YELENA · project-manager — 2026-07-26T14:52:01.782663+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:44:07.583367+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 54m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:44:14.827731+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 2h 55m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:54:09.611149+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 4m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:54:19.431493+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 5m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:56:36.588308+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: #12
YELENA · project-manager — 2026-07-26T17:56:45.012891+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 7m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:06:38.832515+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:06:45.335558+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 17m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:14:21.979977+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:14:31.755644+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 25m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:24:10.916929+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 34m
Pull request: #12
YELENA · project-manager — 2026-07-26T18:24:17.678820+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 3h 35m
Pull request: #12
YELENA · project-manager — 2026-07-26T20:12:42.193392+00:00
Progress
State: running
Completed: 5/6 nodes
Current: none — none
Cost: 0.0090 USD · Elapsed: 5h 23m
Completed
Open
YELENA · project-manager — 2026-07-26T20:12:55.395548+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: #12
YELENA · project-manager — 2026-07-26T20:12:57.527810+00:00
Result
Run completed for ticket #11.
Delivered:
Not delivered:
Verification: make verify — see nodes
Commits: 2 · Cost: 0.0023 USD · Duration: 5h 23m
Pull request: #12