# CAP homepage (cap-protocol.org) ## Metadata | Field | Value | |---|---| | Institute | Molodetz Institute — Research & Retrieval Division | | Subject | cap-protocol | | Document type | Source Dossier | | Tier | 1 | | Source title | CAP CLI Agent Protocol (homepage) | | Source URL | https://cap-protocol.org/ | | Source type | project page | | Source date (published) | Unknown, not stated (living page; draft 2026-05-18 banner) | | Date researched | 2026-10-18 | | Researched by | tai (agent), model: Muse Spark, on behalf of retoor | | Research method | direct page fetch, read in full via saved output | | Confidence | High | | Status | Active | ## Summary Positioning page: the protocol-stack table (MCP/ACP/A2A/CAP layers), the PTY-substrate plus fast-paths plus orchestration pitch, a manifest example, the two normative doc links, the reserved-profile table, status timeline, and FAQ (ACP/A2A differences, binding optionality, cooperative interruption pointer to §10.6). ## Key findings - Layer claim: CAP is orch-to-CLI-agent at fleet scale; one agent may speak all four protocols at once. - Only PTY is required; "most agents implement at most one fast-path" (FAQ) sets the interop expectation tai should design to. - Reserved profiles: devops, data, security, research, content, sysadmin, network. Only coding is defined. - Governance: rsclaw maintainers transitional; LF proposal once 3+ independent implementations exist. Tai would count toward that bar. - Spec text CC BY 4.0, reference code MIT. ## Pros / strengths - Fastest correct mental model of where CAP sits; the FAQ preempts the ACP/A2A confusion directly. - Confirms fast-path optionality as the norm, which justifies tai's phased binding rollout. ## Cons / limitations / caveats - Marketing surface, not normative; the manifest example on the page trims fields the spec requires (e.g. no `capabilities.streaming_output`). - Status timeline may lag the repo (page says reference impl "in progress", repo STATUS says the driver matrix is done). ## Relevance to tai Justifies phased conformance (PTY + one fast-path first) and records the licensing and governance facts the implementation conclusion relies on. ## Changelog | Date | Change | |---|---| | 2026-10-18 | Initial dossier created. |